
Building shown in photo above is located at Matilda Street, 10 minutes walking distance from Sheffield Hallam University, which is the building we use in our development project assignment. During on the way to the site, me and my teammate lost our way and took another 10 minutes on searching the right way, therefore, we had observe the surrounding of site and we found that the site is located at a low crowded location. The surrounding general area has a mix of uses including student accommodation, this is a important issue that we need to take into consideration while we choose the type of development.
A basic survey has conducted by us on site, few works has been delegated between us:
- Measure the internal and external dimension of building by using measure laser and ruler.
- Draw a simple dimension of building and record the building details and conditions
- Take photo
As this assignment is about to maximize the investment potential, which are either refurbishment or demolition and rebuilt, the existing condition of the building has become the first priority for redevelopment of this building. Through the inspection, many defects have been found out such as water leakage from pipe, damaged ceiling, cracking on column and wall. These factors need to take into consideration to find out the best way to optimize the investment potential.
![]() |
| Cracking on External Wall |
Please feel free to comment or visit my pallet wall presentation about the proposal of redevelopment of building at Matilda Street by scanning the QR code shown below for having more detail information or through
| Website: http://padlet.com/cwhao1991/m1s1qi9l2zsx |

No comments:
Post a Comment